cement needed for 1 cubic of ncrete of 1.2.4

Concrete Calculator Estimate Cement, Sand, Gravel

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

More

On-Site concrete calculator.

On-Site Concrete calculator. Use this calculator to determine how much sand, aggregate (gravel) and cement is required for mixing on site a given area of concrete (1:2:4 ratio). Please enter the dimensions in the white fields below and click calculate to display the results. See below for help on concrete.

More

How to Calculate Cement, Sand and Aggregate required

Density of concrete = 2400 kg/cum. So, 1 bag of cement produces = 400/2400 = 0.167 cum. No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags. From above, if the concrete mix is 1:2:4,to get a cubic meter of concrete we require. 1.Cement = 6 bags = 300 kgs. 2.Fine Aggregate = 115/0.167 = 689 kg

More

How to Calculate Quantities of Cement, Sand and

One bag of cement and other ingredients can produce = 400/2400 = 0.167 Cum of concrete (1:2:4) 01 bag cement yield = 0.167 cum concrete with a proportion of 1:2:4. 01 cum of concrete will require. Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags. Sand required = 115/0.167 = 688 Kgs or 14.98 cft. Aggregate required = 209/0.167 = 1251 kgs or 29.96 cft

More

How many cement bags are needed for 1 cubic meter for

It may take long time for me to type here (because i am not that good at typing). i calculated on a paper, so that i can save my time and energy too :-) have a look at this image let me tell you one thing i am uploading my class note of whole proc...

More

Metric calculator for concrete cement, sand, gravel etc

Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and

More

Concrete Calculator Estimate Cement, Sand, Gravel

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

More

On-Site concrete calculator.

On-Site Concrete calculator. Use this calculator to determine how much sand, aggregate (gravel) and cement is required for mixing on site a given area of concrete (1:2:4 ratio). Please enter the dimensions in the white fields below and click calculate to display the results. See below for help on concrete.

More

How many cement bags are needed for 1 cubic meter

It may take long time for me to type here (because i am not that good at typing). i calculated on a paper, so that i can save my time and energy too :-) have a look at this image let me tell you one thing i am uploading my class note of whole proc...

More

How to Calculate Cement, Sand and Aggregate required

Density of concrete = 2400 kg/cum. So, 1 bag of cement produces = 400/2400 = 0.167 cum. No. of bags required for 01 cum of concrete = 1/0.167 = 5.98 bags ~ 6 bags. From above, if the concrete mix is 1:2:4,to get a cubic meter of concrete we require. 1.Cement = 6 bags = 300 kgs. 2.Fine Aggregate = 115/0.167 = 689 kg

More

Metric calculator for concrete cement, sand, gravel etc

Both of these concrete calculators make an allowance for the fact that material losses volume after being mixed to make concrete. Calculator are provided for a general mix and a paving mix, the different ratio of materials are: General mix 1:5 cement:all-in ballast or 1:2½:3½ cement:sharp sand:gravel. and

More

Quantities of Materials Per Cubic Meter of Concrete Mix

Quantities of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions is Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions varies with the mix design of the concrete and mortar respectively.

More

How To Calculate Cement Bags Per Cubic Meter

Thus every time you need to calculate the volume of concrete you need to add the above percentage with dry volume. Wet Volume of concrete = Dry Volume of concrete + 55% of dry volume of concrete or. Wet Volume of concrete = Dry Volume of concrete x 1.55. So whatever volume we get from the above formula, we need to multiply the value with 1.55%

More

How much cement is required in 1 m3 of concrete?

The requirement of cement in 1 m3 of concrete will depend on the grade of concrete suppose for M20 grade of concrete proportion is 1:1.5:3 volume of dry Concrete = 1.54 to 1.57 times Volume of wet concrete Lets assume 1.57 So, volume of cement =ce...

More

How many bags of cement are required in 1m3 of M15?

Hi .. So the design mix is M15 i.e, 1:2:4 Ratio sum = 1+2+4 = 7 Volume of concrete = 1 cubic metre ( wet volume ) Now dry volume of concrete = 45–55% increase in volume × wet volume Dry volume= 1×1.52 (assuming 52% increase in volume) Dry volume =...

More

For 100 sq m cement concrete (1 2 4) 4 cm

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is a) 0.90 m³ b) 0.94 m³ c) 0.98 m³ d) 1.00 m³

More